• 17/05/2025
  • 11/04/2025 Driveway
  • 3/04/2025 Driveway
  • 21/03/2025 Kitchen
  • 28/02/2025 Ensuite
  • 25/02/2025 Kitchen Sink
  • Painting - Doors & Ceiling 14/02/2025
  • 12/02/2025 Roof flashings
  • 7/02/2025 Upstairs
  • 3/02/2025 Paint cladding
  • 30/01/2025 Finalise cladding
  • 8/01/2025 Kitchen Tiling
  • 1/01/2025 Tiling
  • 26/12/2024 Washed bricks
  • 12/12/2024
  • 6/12/2024 Stairs
  • 25/11/2024
  • 23/11/2024 Joinery
  • 15/11/2024 Plasterboard
  • 12/11/2024 Insulation installed
  • 9/11/2024 Lower roof
  • 31/10/2024 Scaffolding removed
  • 22/10/2024 Upstairs painting and downpipes
  • 19/102024 Upstairs cladding
  • 15/10/2024 Finalise brickwork
  • 12/10/2024 Upstairs windows
  • 25/09/2024 Upstairs wrap
  • 23/09/2024 Scaffolding
  • 22/09/2024 Fencing
  • 20/09/2024 Scaffolding removed
  • 18/09/2024 Finalise downstairs brickwork
  • 17/09/2024 more brickwork
  • 14/09/2024 second story roofing
  • 11/09/2024 more brickwork
  • 10/09/2024 brickwork
  • 9/09/2024 wrap and guttering
  • 7/09/2024 framing and ground floor windows

  • 4/09/2024 framing, roof trusses and ground floor windows

  • 27/08/2024 framing and roof trusses

  • 17/8/2024 upstairs framing

  • 15/08/2024 upstairs framing

  • 6/08/2024 more framing

  • 5/08/2024 framing

  • 31/07/2024 structural steel

  • 8/07/2024 slab

  • 6/07/2024 slab

  • 4/07/2024 ready for concrete

  • 2/07/2024 plumbing

  • 26/06/2024 trenching

  • 02/06/2024 block levelled (again)

  • 02/06/2024 original block level

  • 20/02/2024

  • 17/12/2023

  • Whittier Ave May 2023